Roadworks

On this page you will find which road works are in progress within the built-up area in municipality of Voorne aan Zee , how long they will last and any detour.

Brielle

Hellevoetsluis

Renovation of the Marinebuurt neighborhood

When 

  • Work will commence on Monday, November 24, 2025, and continue until Friday, November 13, 2026. 

Where

Contact

  • Questions about the work can be directed to the contractor Van Doorn, Mr. Kentie, environmental management officer, telephone number 0345 57 11 41 or email nl.

Traffic lights at De Sprong and Nijverheidsweg

When

  • The traffic lights will be replaced from Wednesday, June 17, through Friday, June 19. 

Where

  • The intersection of De Sprong and Amnesty Internationallaan and the intersection of Nieuweweg and Nijverheidsweg in Hellevoetsluis. 
  • Contractor Van Gelder is replacing the traffic lights, control boxes, and push buttons at both intersections. 
  • There will be a road narrowing at both intersections during the construction work. 
  • Both intersections are expected to be fully open again starting Friday afternoon, June 19. 

Detour

  • A detour route is marked with signs. 
  • Traffic controllers direct traffic. 
  • The intersections are not completely closed. There is a road narrowing.
  • Please allow for extra travel time. 

Contact

  • Contractor Van Gelder is carrying out the work on behalf of the municipality of Voorne aan Zee.
  • Do you have any questions? Please contact the municipality at 14 0181.

Bicycle crossing points on Nelson Mandela Avenue

When

  • The work will take place on Monday, June 29, and Tuesday, June 30, between 9:00 a.m. and 9:00 p.m. Nelson Mandelalaan will be closed during the work.

Where

  • The crosswalks at the intersections of Nelson Mandela Avenue with Bonseweg and Dorpsweg.
  • The crosswalks will be painted yellow to make them more visible. 

Detour

  • During the construction work, Nelson Mandelalaan will be closed to traffic between the Dag Hammarskjöldlaan roundabout and the Moeder Teresalaan roundabout.
  • Through traffic will be rerouted via Kanaalweg Westzijde. The Berkman gas station will remain accessible.
  • Work will be carried out at each crossing. Cyclists will be rerouted via one of the two crossings.
    • On Monday, June 29, cyclists will be able to use the Dorpsweg crosswalk.
    • On Tuesday, June 30, cyclists will be able to use the Bonseweg crossing. 

Contact

  • Contractor Van Gelder is carrying out the work. If you have any questions about the work or the diversion route, please contact Liesbeth van Dijke, Van Gelder's environmental manager, on +31 (0)6 81 93 84 92
  • Van Gelder shares information and news via the BouwApp. Download the BouwApp from the App Store or the Google Play Store. Search for “Roadwork Voorne aan Zee in the app and follow it for the latest updates.

Kooilaan Sidewalk

When

  • The work will take place from Monday, June 29, through Friday, July 24. 

Where 

  • Contractor Van Doorn is carrying out various repair work on the sidewalk across from Kooilaan, between Vloedlijn and Schelpenpad. 
  • The sidewalk and curb are being repaved.

Detour 

  • The sidewalk between Vloedlijn and Schelpenpad will be closed off entirely. 
  • Pedestrians are being rerouted to the other side of the street.

Contact 

  • Contractor Van Doorn is carrying out the work on behalf of the municipality of Voorne aan Zee. 

Paving Dijkweg

When

  • The work will take place on Wednesday, June 24, and Monday, June 29, from 7:00 a.m. to 4:00 p.m.

Where

  • On Dijkweg, between Dorpsweg and Dag Hammarskjöldlaan, contractor Van Gelder is replacing the asphalt. 
  • On June 24 and 29, that section of Dijkweg will be closed. 
  • On Wednesday, June 24, a layer of asphalt will be removed. Please be careful when cycling on the road in the days following. The road surface is uneven.
  • New asphalt will be laid on Monday, June 29.

Detour

  • A detour route is marked with signs. 
  • The houses on Dijkweg can be reached via Moeder Teresalaan.

Contact

  • Contractor Van Gelder is carrying out the work on behalf of the municipality of Voorne aan Zee. 

Paving the Bonseweg Bike Path

When

  • The work will take place on Wednesday, June 24, and Monday, June 29, from 7:00 a.m. to 4:00 p.m.

Where

  • On the Bonseweg bike path between Kanaalweg Westzijde and Marcandostraat, contractor Van Gelder is replacing the asphalt. 
  • On Wednesday, June 24, a layer of asphalt will be removed. Please be careful when cycling in the days following the work, as the road will be uneven.
  • New asphalt will be laid on Monday, June 29.

Detour

  • A detour route is marked with signs. 

Contact

  • Contractor Van Gelder is carrying out the work on behalf of the municipality of Voorne aan Zee. 

Oostvoorne

Rockanje

Redesign of Jupiter Avenue and surrounding area

When 

  • From Monday, March 9, until the end of December. 

Where

  • Jupiterlaan, Plutostraat, Sagittastraat, Orionstraat, Librastraat, Wega, and part of Van Leijdenstraat in Rockanje.
  • We are starting with the construction of a new rainwater sewer. This means that rainwater will not end up in the sewage system, but will be discharged into the groundwater or the canal. All drainage wells on the roadway will be connected to this sewer.
  • After installing the new sewer system, the street will be closed again using the same materials. The sewer trench must settle for three months (to prevent subsequent subsidence of the street).
  • Then we will start redesigning the neighborhood. Among other things, the paving will be completely redone. We will use new materials for this. New shrubs and trees will also be planted in the neighborhood.

Detour 

  • During the work, some homes will be more difficult to reach by car. Residents will always be able to reach their homes on foot.

Contact 

  • Contractor Kraaijeveld is Voorne aan Zee this work on behalf of the municipality Voorne aan Zee . If you have any questions or complaints, please contact Marjolein Kraaijeveld of contractor Kraaijeveld by email nl or by telephone on 0180 61 35 22

Heveringseweg / Boomweg

The Hollandse Delta Water Authority is going to tackle the section running from Oostvoorne to Rockanje. This concerns the Heveringseweg, Verlengde Lodderlandsedijk, Boomweg, and Vleerdamsedijk. The section will be redesigned to meet sustainable safety standards, and major maintenance will be carried out on some parts. 

More information about the work and the schedule can be found on the project website of the Hollandse Delta Water Authority.

Middeldijk

When

  • The work will take place from Monday, June 1, through Friday, June 5. Middeldijk will be closed during the work. 

Where

  • Following the work carried out in late 2025, the Middeldijk will be marked with red paint on the bike lanes and yellow paint at intersections and speed bumps.
  • Work on the speed bump at the intersection of Middeldijk and Kerkweg will begin on Monday, June 1. The work will continue through Friday, June 5.
  • On Tuesday, June 2, and Wednesday, June 3, we will be applying a coat of yellow paint to the intersection of Middeldijk, Kerkweg, and Hoogvlietlaan, as well as the intersection of Middeldijk and Mercuriuslaan, and the speed bumps in between.
  • On Thursday, June 4, and Friday, June 5, the bike lanes on Middeldijk will be repainted red.

Detour 

  • Middeldijk is closed. A detour route is marked with signs. Traffic controllers are also on site to direct traffic. 
  • Residents of Middeldijk have received more information about parking and access to their homes in a letter to residents from contractor Van Gelder. 

Contact 

  • The work is being carried out by Van Gelder. If you have any questions about the work or the detour route, please contact Liesbeth van Dijke, Van Gelder’s site manager, at06 81 93 84 92. 
  • Van Gelder shares information and news via the BouwApp. Download the BouwApp from the App Store or the Google Play Store. Search for “Roadwork Voorne aan Zee in the app and follow it for the latest updates.

Municipality of Voorne aan Zee general

BuildingApp

Contractor Van Gelder is carrying out Voorne aan Zee on the road network in our municipality on behalf of the municipality Voorne aan Zee . This mainly involves asphalting work. This work may cause temporary inconvenience to road users and local residents. Road diversions may also be put in place in connection with the work.

Stay informed through the ConstructionApp

Contractor Van Gelder uses the BouwApp to keep residents informed. Would you like to stay up to date on the planning, progress, and any diversions related to the (maintenance) projects? Download the BouwApp from the App Store or Google Play store. Search for "Wegwerkzaamheden Voorne aan Zee" in the app and follow it for the latest updates.

We thank you for your understanding and cooperation.

Learn more about road works

Do you have a question or complaint about a road? If so, please contact the road manager directly.

The roads in the municipality of Voorne aan Zee are managed by different government organizations. The Department of Public Works manages the N57 and the A15. The province of Zuid-Holland manages the N218, N494, N496 and the N497. All other (polder) roads are managed by the Hollandse Delta water board. The municipality manages the roads within the built-up area. You can look up who the road administrator is via the Rijkswaterstaat website if you are in doubt.