Message from E-Connection: Preliminary Soil Survey

In preparation for the construction of two new wind turbines on the Haringvliet Dam, exploratory soil investigations will take place from April 21 through 24. In the area, multiple samples will be taken to a depth of several meters using a hand auger. In addition, two limited boreholes will be drilled near a potential temporary exit from the N57 to the parallel road.